F47 Series Parallel Shaft Helical Geared Motor with Foot Mounting

F47 Series Parallel Shaft Helical Geared Motor with Foot Mounting

F sequence Parallel Shaft-CZPTcal Geared Motor Qualities

1.Functions:

  1. Higher effectiveness: 92%-ninety four%
  2. Parallel output, compact construction, massive output torque, clean operation, minimal noise and prolonged support life.
  3. Higher precision: the equipment is made of substantial-quality alloy metal forging, carbonitriding and hardening remedy, grinding procedure to make certain higher precision and steady managing.
  4. Substantial interchangeability: highly modular, serial style, strong flexibility and interchangeability.

two. CZPT parameters

Ratio 3.seventy seven-276.77
Input electrical power .12-200KW
Output torque 3.5-21700N.m
Output speed 5-352rpm
Mounting kind Foot mounted, foot mounted with strong shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Input Approach Flange enter(AM), shaft enter(Advert), inline AC motor enter, or AQA servo motor
Brake Release HF-manual release(lock in the brake launch situation), HR-manual release(autom-atic braking position)
Thermistor TF(Thermistor defense PTC thermisto)
TH(Thermistor defense Bimetal swotch)
Mounting Placement M1, M2, M3, M4, M5, M6
Kind F37-F157
Output shaft dis. 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing content HT200 substantial-toughness solid iron from R37,forty seven,fifty seven,sixty seven,77,87
Housing material HT250 High strength solid iron from R97 107,137,147,
157,167,187
Warmth treatment technology carbonitriding and hardening treatment method
Effectiveness ninety two%-ninety four%
Lubricant VG220
Security Class IP55, F class

CZPTshine Push

ZheJiang CZPTshine Generate Co.,Ltd,the predecessor was a point out-owned military mould business, was set up in 1965. CZPTshine specializes in the comprehensive electrical power transmission remedy for large-finish equipment manufacturing industries dependent on the intention of “System Merchandise, Software Layout and Professional Support”.
CZPTshine have a strong complex drive with over 350 personnel at current, which includes above 30 engineering experts, thirty top quality inspectors, covering an spot of 80000 sq. meters and types of advanced processing equipment and testing equipments. We have a good foundation for the sector application advancement and services of high-end speed reducers & variators proudly owning to the provincial engineering technological innovation investigation centre,the lab of equipment speed reducers, and the foundation of present day R&D.

Our Staff

High quality Handle
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
item is a product inspection to determine the qualified products.

seven. Certification.
All our products get ISO & CE & UL certification.

Packing

Supply

 

F47 Series Parallel Shaft Helical Geared Motor with Foot Mounting